Client: King’s College London

Type of work: Refurbishment of existing areas to form two new labs in two phases.

Site address: 4th Floor Lambeth Wing, St Thomas Hospital, Lambeth Palace Road, London, SE1 7EH

Synthetic Chemistry Lab 1 and Lab 2 – Lab Refurbishment, St Thomas’ Hospital

The Project

The project comprised the entire refurbishment of existing lab areas, in two phases to ensure works could continue on research. Works including:

  1. Full back to shell strip out in two labs
  2. Full M&E installation,
  3. Ceilings, , Vinyl flooring,
  4. Trovex Hygidoors and Hand wash Pods
  5. New hygienic Benching, Shelving and Cupboard
  6. Safety Cabinets and equipment
  7. Decorating throughout
  8. Fire stopping works

Office Suite – Refurbishment Guys Hospital

How We Solved The Problems

By using established M&E teams that work closely with GSTT on all their buildings we have found not only their knowledge of the systems throughout the areas we are working and their relationships with the in house facility teams ensure works can carried out to ensure little to no disturbance to the surrounding facilities.

Office Suite – Refurbishment Guys Hospital

How We Solved The Problems

And again by using these teams which we have built up good teams not only with them and GSTT but with the various managers who look after the department within the hospitals, this is also very helpful when we need to carry out validations which may affect department surrounding the areas we are working in as we can get agreement on time slots quickly at times that suit all parties.