CASE STUDIES: Southend Hospital – Maternity Department

New Build/refurb: Refurbishment

Project Description:

The works to the Butterfly Suite involved removal of all loose fittings, strip out of defective surfaces in kitchen, damaged units and stripping of tiles.

DOWNLOAD FULL CASE STUDY